TxDOT rolls out $1.5 billion LBJ East project as legislators decide how to pay the bill
Written by
Ray Leszcynski
The Texas Department of Transportation is rolling out a public preview to the $1.5 billion LBJ East project even as state legislators are wide apart on where some of the money will come from. The 11.2-mile stretch of Interstate 635 between Central Expressway and Interstate 30 is TxDOT's top priority for the region. It will bring more lanes and continuous frontage roads to areas of Lake Highlands, Far East Dallas, Garland and Mesquite where tens of thousands of vehicles are slowed daily.
LBJ East reconstruction
LBJ East reconstruction
http://www.dallasnews.com/news/transpor ... e-pay-bill
You do not have the required permissions to view the files attached to this post.
- gshelton91
- Posts: 70
- Joined: 28 Oct 2016 11:01
Re: LBJ East reconstruction
Great Frontage roads- Just what we need more of. If they are going to build frontage roads they should not allow businesses to open onto them... Businesses should have to open onto side roads... otherwise they will just slow down the traffic and we get no benefit from the road. along with a lot of other negatives of frontage roads.
- Hannibal Lecter
- Posts: 829
- Joined: 19 Oct 2016 19:57
Re: LBJ East reconstruction
gshelton91 wrote:Great Frontage roads- Just what we need more of. If they are going to build frontage roads they should not allow businesses to open onto them... Businesses should have to open onto side roads... otherwise they will just slow down the traffic and we get no benefit from the road. along with a lot of other negatives of frontage roads.
The entire purpose of frontage roads is to locate businesses on them. About a decade ago TxDOT floated a proposal to let them build more highways without them. The legislature quickly quashed that idea -- they were inundated with calls from small town and county politicians throughout the state convinced that they had to have frontage roads or their burg was doomed.
Re: LBJ East reconstruction
Toll Lanes Planned for LBJ Between US 75 and I-30
Ten-year project would expand I-635, cost nearly $2 billion
By Ben Russell, NBCDFW.com, 11-06-17
A plan to expand a nearly 11-mile stretch of Interstate 635 between the interchanges with US 75 Central Expressway and Interstate 30 would include the installation of managed toll lanes for the entirety of the route.
The North Central Texas Council of Governments and the Texas Department of Transportation have long planned an expansion of LBJ Freeway east of the High Five interchange. Managed toll lanes had previously been planned for only a portion of the project.
...
Article & video: https://www.nbcdfw.com/news/local/Toll-Lanes-Planned-for-LBJ-Between-75-and-30-455546413.html
Ten-year project would expand I-635, cost nearly $2 billion
By Ben Russell, NBCDFW.com, 11-06-17
A plan to expand a nearly 11-mile stretch of Interstate 635 between the interchanges with US 75 Central Expressway and Interstate 30 would include the installation of managed toll lanes for the entirety of the route.
The North Central Texas Council of Governments and the Texas Department of Transportation have long planned an expansion of LBJ Freeway east of the High Five interchange. Managed toll lanes had previously been planned for only a portion of the project.
...
Article & video: https://www.nbcdfw.com/news/local/Toll-Lanes-Planned-for-LBJ-Between-75-and-30-455546413.html
-
- Posts: 3190
- Joined: 21 Oct 2016 08:45
- Location: Dallas
Re: LBJ East reconstruction
I am so excited I could just spit.
“Growth for the sake of growth is the ideology of the cancer cell”
- joshua.dodd
- Posts: 458
- Joined: 23 Oct 2016 01:11
Re: LBJ East reconstruction
2027 completion date? Jesus...
Re: LBJ East reconstruction
There may be a compromise yet, after many twists and turns. Now TxDOT says the project can move forward if there are no new tolled lanes.
https://www.dallasnews.com/news/transpo ... tates-list
https://www.dallasnews.com/news/transpo ... tates-list
Re: LBJ East reconstruction
There may be a compromise yet, after many twists and turns. Now TxDOT says the project can move forward if there are no new tolled lanes.
https://www.dallasnews.com/news/transpo ... tates-list
https://www.dallasnews.com/news/transpo ... tates-list
Re: LBJ East reconstruction
The squabbles and hand-wringing look to be over on this one. Construction contract will be awarded next year, with completion in 2024. Yes, commuters, 5 years of fun and detours.....
https://www.dallasnews.com/news/transpo ... st-project
https://www.dallasnews.com/news/transpo ... st-project
Re: LBJ East reconstruction
Looks like this project is starting next week with the permanent closure of the HOV lanes.
https://635east.com/be-in-the-know/clos ... n-changes/
https://635east.com/be-in-the-know/clos ... n-changes/
Re: LBJ East reconstruction
It appears that on SB 635 side, new piers are already being placed to support the new ramps which will replace the highest flyovers. Half of the Galloway Ave bridge over 30 has been demolished while the new bridge is already being constructed. My biggest concern is going to be the atrocious exchange between 635/Shiloh/Garland Rd/Northwest Hwy. The newest renderings show a direct connection to Shiloh which hopefully will relieve the large truck traffic. The Garland Rd/Northwest Hwy Intersection is getting a new set of lights but I hardly think that’s going to help because there doesn’t seem to be much in the way of improvements at that intersection.