In this article about Cresson, along US 377 SW of Fort Worth, a side note is brought up in the article about US 377 getting a relief route (TxDOT-speak for a bypass) to the west of Cresson. It will span 3 miles in all; the center of town has a railroad crossing at US 377's intersection with TX 171, and between the narrow in-town right-of-way and the railroad/TX 171 crossing, TxDOT feels a bypass is needed. Work is supposed to begin next year with completion set for 2022.
https://www.fwweekly.com/2018/09/12/smokin-2/
Cresson: US 377 bypass
-
- Posts: 1008
- Joined: 28 Jul 2018 07:38
Return to “The Bus + Roads/Highways/Bridges”
Jump to
- The Metropolis
- City Issues/News
- Suburban + Exurban Issues/News
- Urban Development
- Suburban + Exurban Development
- Urban Photography + Videography
- Transportation + Infrastructure
- Rail + Guided Transit
- The Bus + Roads/Highways/Bridges
- The Airports
- The Parks, Trails, + Miscellaneous Infrastructure
- Art, Architecture, Urban + Green Design
- Art + Sol
- Opolis Blueprints
- Beyond DFW
- Texas Town + City Issues/News
- Texas Urban/Suburban/Exurban Development
- Texas Transportation + Infrastructure
- U.S. + World City Issues/News
- U.S. + World Urban/Suburban/Exurban Development
- U.S. + World Urban Development
- U.S./World Transportation + Infrastructure
- 33 North
- General Discussion
- The Pitch
- General Photography
- Site Issues + Feedback